The wishlist name can't be left blank
Upper section, Hot-Dip Galvanizing + Painting 180 tower

Upper section, Hot-Dip Galvanizing + Painting 180 tower

Middle Section, Hot-Dip Galvanizing + Painting 180 tower

3m Middle Section reinforced for the erection of a 180 tower.

In stock
SKU
30310x_180_Intermedio_GC
Select your product
Grouped product items
Ref. 303104 Colour: Red
Ref. 303103 Colour: White
Product Sheet
Highlights
  • Anchoring system with union nuts
  • Easy and quick mounting
  • Fully automated soldering
  • 180 tower maximum height: 26.5m (as per calculation conditions)
  • The hot-dip galvanizing surface treatment provides enhanced durability in adverse corrosion conditions
  • Colour paint, oven-lacquering with polyester electrostatic powder
  • Main tubes of 20*2 mm and transverse rods of 6 mm

Ref. 303104
Surface facing the wind0.272

Physical data

Net weight: 11,000 g

Gross weight: 11,000 g

Width: 160 mm

Height: 3,000 mm

Depth: 139 mm

Main product weight: 11,000 g

Packing

Unit 1 Units

Ref. 303103
Surface facing the wind0.272

Physical data

Net weight: 11,227 g

Gross weight: 12,900 g

Width: 160 mm

Height: 3,000 mm

Depth: 138 mm

Main product weight: 11,227 g

Packing

Unit 1 Units

More Information
tlv_tabla_especificaciones
Surface facing the wind0.272
tlv_sku_group_search 303104,303103
tlv_diferencias Colour: White
tlv_dim_product_x 160
tlv_dim_product_x_label Width
tlv_dim_product_x_unit mm
tlv_dim_product_y 3,000
tlv_dim_product_y_label Height
tlv_dim_product_y_unit mm
tlv_dim_product_z 138
tlv_dim_product_z_label Depth
tlv_dim_product_z_unit mm
tlv_weight_product_label Main product weight
tlv_weight_product 11,227
tlv_weight_product_unit g
tlv_gross_weight_label Gross weight
tlv_gross_weight 12,900
tlv_gross_weight_unit g
tlv_net_weight_label Net weight
tlv_net_weight_unit g
tlv_net_weight 11,227
tlv_1_type_pack Unit
tlv_1_type_pcs_pack Units
tlv_1_pcs_pack 1

Mounting details

It consists in fixing the lower section to the base, set it in upright position and levelling it. The subsequent Middle Sections are then mounted, equipped with the appropriate guy wires; the mounting is carried out by climbing on the previously mounted sections and hoisting the new section with the help of the appropriate lifting tools.