The wishlist name can't be left blank
Middle Section, Hot-Dip Galvanizing + Painting 550 ULTRA tower - Reinforced

Middle Section, Hot-Dip Galvanizing + Painting 550 ULTRA tower - Reinforced

Lower section pivoting, Hot-Dip Galvanizing + Painting 550 ULTRA tower - Reinforced

Lower section pivoting, Hot-Dip Galvanizing + Painting 550 ULTRA tower - Reinforced

Top mast holder, Hot-Dip Galvanizing + Painting 550 ULTRA tower - Reinforced

Steel mast holders are reinforced to support configurations of significant height (200 m approx.) or subject to high loads and adverse weather conditions.
Ref. 313810
Product Sheet
EAN13: 8424450181249
SKU
313810
Highlights
  • Anchoring system based on plates and union nuts
  • Outstanding stiffness and mechanical strength
  • Solid tube, no internal corrosion
  • Maximum height of the 550 ULTRA tower: 200 m (as per calculation conditions)
  • The hot-dip galvanizing surface treatment provides enhanced durability in adverse corrosion conditions
  • Colour paint, oven-lacquering with polyester electrostatic powder
  • Mast max. diameter: 62mm

Surface facing the wind0.037

Physical data

Net weight: 20,000 g

Gross weight: 20,000 g

Width: 700 mm

Height: 250 mm

Depth: 638 mm

Main product weight: 16,000 g

Packing

Unit 1 Units

More Information
tlv_reflog TOBER550XL
tlv_tabla_especificaciones
Surface facing the wind0.037
tlv_diferencias Reinforced top mast holder red (RAL 3020) 0.25m
tlv_ean 8424450181249
tlv_dim_product_x 700
tlv_dim_product_x_label Width
tlv_dim_product_x_unit mm
tlv_dim_product_y 250
tlv_dim_product_y_label Height
tlv_dim_product_y_unit mm
tlv_dim_product_z 638
tlv_dim_product_z_label Depth
tlv_dim_product_z_unit mm
tlv_weight_product_label Main product weight
tlv_weight_product 16,000
tlv_weight_product_unit g
tlv_gross_weight_label Gross weight
tlv_gross_weight 20,000
tlv_gross_weight_unit g
tlv_net_weight_label Net weight
tlv_net_weight_unit g
tlv_net_weight 20,000
tlv_1_type_pack Unit
tlv_1_type_pcs_pack Units
tlv_1_pcs_pack 1

Mounting details

It consists in fixing the lower section to the base, set it in upright position and levelling it. The subsequent Middle Sections are then mounted, equipped with the appropriate guy wires; the mounting is carried out by climbing on the previously mounted sections and hoisting the new section with the help of the appropriate lifting tools.