The wishlist name can't be left blank
Top mast holder, Hot-Dip Galvanizing + Painting 550 ULTRA  tower - Reinforced

Top mast holder, Hot-Dip Galvanizing + Painting 550 ULTRA tower - Reinforced

Lower section pivoting, Hot-Dip Galvanizing + Painting 550 ULTRA tower - Reinforced

3m lower section pivoting for the erection of a 550 ULTRA-series tower.
The section is painted red (RAL 3020).
Guy wires are required for pivoting sections.

Ref. 313911
Product Sheet
EAN13: 8424450178959
SKU
313911
Highlights
  • Anchoring system based on plates and union nuts
  • Outstanding stiffness and mechanical strength
  • Solid tube, no internal corrosion
  • Maximum height of the 550 ULTRA tower: 200m (as per calculation conditions)
  • The hot-dip galvanizing surface treatment provides enhanced durability in adverse corrosion conditions
  • Colour paint, oven-lacquering with polyester electrostatic powder

Surface facing the wind0.7

Physical data

Net weight: 189,000 g

Gross weight: 189,000 g

Width: 700 mm

Height: 3,185 mm

Depth: 638 mm

Main product weight: 185,000 g

Packing

Unit 1 Units

More Information
tlv_reflog TFUSS550XL
tlv_tabla_especificaciones
Surface facing the wind0.7
tlv_diferencias Reinforced Middle Section H.G. + red (RAL 3020) 3m
tlv_ean 8424450178959
tlv_dim_product_x 700
tlv_dim_product_x_label Width
tlv_dim_product_x_unit mm
tlv_dim_product_y 3,185
tlv_dim_product_y_label Height
tlv_dim_product_y_unit mm
tlv_dim_product_z 638
tlv_dim_product_z_label Depth
tlv_dim_product_z_unit mm
tlv_weight_product_label Main product weight
tlv_weight_product 185,000
tlv_weight_product_unit g
tlv_gross_weight_label Gross weight
tlv_gross_weight 189,000
tlv_gross_weight_unit g
tlv_net_weight_label Net weight
tlv_net_weight_unit g
tlv_net_weight 189,000
tlv_1_type_pack Unit
tlv_1_type_pcs_pack Units
tlv_1_pcs_pack 1

Mounting details

It consists in fixing the lower section to the base, set it in upright position and levelling it. The subsequent Middle Sections are then mounted, equipped with the appropriate guy wires; the mounting is carried out by climbing on the previously mounted sections and hoisting the new section with the help of the appropriate lifting tools.